Connect with us

MTA News

Walk-through trains are coming to the New York Subway

Published

on

kawasaki rail car r211

Rolling stock component specialist Hübner used the InnoTrans trade show in Berlin on September 18-21 to introduce a model of the open gangway it is developing for the next generation of New York Subway cars.

Currently, New York Subway cars have no through gangways between cars, and transport advocates in the city have long argued that their introduction would help to mitigate overcrowding.

The first design to use open gangways will be the R211 cars which Kawasaki Rail Car is to supply to New York City Transit under a contract awarded in January worth up to $3·7bn. This will see an initial batch of 535 cars delivered, but this could rise to 1 077 vehicles if NYCT exercises all the contract options it holds.

Of the initial build, a pre-series fleet of 20 is to be equipped with Hübner gangways, although the company says that it expects to produce ‘more than 1 000’ of the assemblies from 2020. Production will largely be undertaken at its factory in South Carolina in order to comply with Buy America regulations.

‘We are proud to have won this very important order for the New York Subway’, said General Manager Helge Förster. ‘With the possibility of moving from one car to the next, not only is the comfort level of passengers increased but their safety and the subjective feelings of security are also improved, particularly in a big city environment. Furthermore, and this is the most important aspect, more passengers can be transported.’

Source: https://www.metro-report.com/news/metro/single-view/view/walk-through-trains-are-coming-to-the-new-york-subway.html

Continue Reading
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

MTA News

Amtrak train cars detach as passengers head to New York City ahead for Thanksgiving

Published

on

By

amtrak train

It was a frustrating and at times alarming Thanksgiving Eve for many train travelers in the tri-state area who were trying to get home for the holiday, CBS New York reports.

Amtrak Train 68, called the Adirondack, was traveling from Montreal to New York’s Penn Station when two of its cars separated near Albany shortly before 7:30 p.m. local time.

CBS New York said none of the 287 passengers or crew were injured, and the rail company said a recovery engine was dispatched to transfer affected passengers from the disabled train.

Chuck Reeves, a software engineer from Troy, New York, told The Associated Press was aboard the first car behind the locomotive and said when the train pulled away, he and other passengers heard a pop and a hiss, smelled electrical burning and felt a rush of cold air.

The AP also said some crying children were comforted by their parents, but for the most part nobody panicked. A state trooper soon boarded to make sure everyone was OK, according to AP.

Earlier in the day, NJ Transit service along the Northeast Corridor and North Jersey Coast lines was briefly suspended on one of the busiest travel days of the year due to overhead wire problems in New Jersey.

Crowds were packed to the brim at Penn Station New York after NJ Transit said plastic wrap became tangled in Amtrak-owned wires near the North Elizabeth station.
Service resumed after less than an hour, but eventually resumed with residual delays of up to 30-minutes.

NJ Transit and private bus carriers were cross-honoring rail tickets and passes, as were Path stations in Hoboken, Newark Penn Station and Herald Square.

It wasn’t immediately known when the passengers from the disabled Amtrak train would arrive in New York City.

Source: https://www.cbsnews.com/news/amtrak-train-68-adirondack-new-york-city-cars-separate-passengers-stranded-today-2018-11-21/

Continue Reading

MTA News

Private companies have worse track record than MTA in subway elevators

Published

on

By

elevator subway new york

When it comes to functioning subway elevators, the Barclays Center makes the MTA look good.

Barclays Center is among the private, non-government entities responsible for maintaining dozens of elevators at subway stations — and most do a lousy job of it, new data shows.

An elevator Barclays Center operates in the Atlantic Ave.-Barclays Center transit hub was out of service for 88 days between January and June, and worked just 52% of the time, says a study by The Transit Center, a research firm.

The Transit Center dubbed Barclays Center and seven other private groups that operate elevators the El-Evaders.
“It’s a travesty — I actually got stuck on this elevator about a year ago,” said Dustin Jones, an disability advocate who uses a wheelchair.

Jones, who’s attended basketball games and wrestling events at Barclays Center, was dismayed that the main elevator facing the station is so unreliable. It could force people with disabilities onto the hectic streets to find another way to access the station.

“Why should I have to navigate around busy Atlantic Ave.?” he asked.
One problem for Barclays Center is that the elevator’s manufacturer is out of business, making parts hard to find, said to Mandy Gutmann, spokeswoman for BSE Global, which owns the arena.

“We are well aware of the elevator’s operational issues and are frustrated that this is not resolved,” Gutmann said. BSE Global hopes to correct the problem by bringing in a new company to overhaul and service the elevator, she said.

Barclays Center ought to do better, said Councilman Brad Lander, whose district abuts the arena.

“They currently make the MTA’s elevator performance look stellar,” Lander said.

Elevators maintained by private real estate companies — 45 machines in total — had poor performance compared to those run by the Metropolitan Transportation Authority.

Privately-run subway elevators were out of service 19% of the time during the first six months of 2018, The Transit Center found. MTA-operated elevators were out of service just 3.6% of the time, the data shows.

“Our private sector partners must do their part to keep their parts of subway stations in good working order and we’re working closely with them to improve elevator and escalator availability and improve communication to customers when there is an outage,” MTA spokesman Shams Tarek said in a statement. “This is part of an all-out focus on elevator and escalator availability regardless of ownership.”

The companies responsible for two elevators at 42nd St.-Port Authority subway station — Tishman Asset Corporation and the Intercontinental Hotel — had to take one out of service for 57 days, giving it an availability rate of 68%. The other elevator was out for 34 days, and was in service for 80% of the time.

Hines Incorporated and Bank of China — the companies behind the 7 Bryant Park office tower — are responsible for an elevator at the 42nd St.- Bryant Park subway stop.

It was out of service on 36 days from January to June, with an average availability rate of 80%.

Hines spokesman Mark Clegg blamed the outages on vandalism from homeless people that lead to electrical malfunctions. He declined to elaborate, but said that “our elevators are never out for long and when something like this happens repeatedly, we do our best to get them back online as quick as possible.”

Colin Wright, advocacy associate at the Transit Center, said penalties under contract are not enough.

“Whatever contractual penalties are in place for these developers, they need to be strengthened,” Wright said. “They have an obligation to, not only to disabled riders all other riders, but there’s an obligation to the city when they’re accepting huge financial benefits to uphold their end of the contract.”

Source: http://www.nydailynews.com/new-york/ny-metro-barclays-elevator-down-mta-20181112-story.html

Continue Reading

MTA News

MTA to buy Grand Central Terminal

Published

on

By

grand central terminal new york

The Metropolitan Transportation Authority is planning to buy New York’s Grand Central Terminal for $35 million after years of renting.

The Wall Street Journal reports the MTA finance committee approved the purchase on Tuesday. The proposal will go before the full board on Thursday and is expected to pass. The deal also includes tracks used by the Metro-North Railroad.

The MTA currently pays close to $2 million a year to rent the terminal and tracks from investment group Midtown Tracking Ventures LLC.
The purchase would allow the MTA to get a share of the profits from developments built near the tracks.

It would also give the authority more control over the terminal before the Long Island Rail Road starts operating there in about four years.

Copyright 2018 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed

Source: http://www.fox5ny.com/news/mta-to-buy-grand-central-terminal

Continue Reading

Trending

TransportationVoice